User Tools

Site Tools


technical:24.04_ups_setup_with_nut

This is an old revision of the document!


APC UPS Devices

Install the required packages:

apt install apcupsd apcupsd-cgi

nano /etc/apcupsd/apcupsd.conf:

<pre> UPSCABLE usb UPSTYPE usb #DEVICE /dev/ttyS0 POLLTIME 60 BATTERYLEVEL 10 MINUTES 3 Restart the UPS monitoring service: </pre>

systemctl restart apcupsd.service

Check /var/log/syslog for errors and check communication with:

apcaccess

technical/24.04_ups_setup_with_nut.1767651682.txt.gz · Last modified: by mark_scottworld.net

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki